LO CHECKING ON MAINTENANCE WORK UNDER HIS RESPONSIBILITY
In making sure that the infrastructure under his responsibility are well maintained, Lo Khere Chiang recent went around and inspected work that are being done on Jalan Stakan, which comes under Kota Samarahan Municipal Council (KSMC).
According to the Batu Kitang assemblyman, the work would enter the second phase soon because the main road had already been resurfaced.
“The second phase will see road repair work done at the lanes which are connected to the main road that is being maintained by KSMC. A budget of RM600,000 is needed for the project’s second phase,” he said.
PMC technician Wan Beng Tee and assistant engineer Lijuina Ngojen were among those who accompanied Lo during the inspection.
No comments:
Post a Comment